Semua tentang sawit

Isnin, 17 Januari 2022

Mini Task

Pengiraan mini task
4 Oktober 2021
Path 1
1D = 72 task
1D = 3 Zon
1 Zon = 3 task
1 Task = 120 pokok

Path 2
D1 = 8 task
D8 = 63 task

507.87 hek/D8 = 63.48 hek/D
63.48 hek x 136 = 8633 pokok/D
1 pahat = 120 pk/task
1 pahat C1R2 = 3.50 hek x 3 org = 10.50 hek
10.50 hek x 136 = 1428 pokok
1428 pokok/120 pokok = 11.90 (12 task)
1 pahat = 12 task
C1R2 = 5 + 10 
Alatan : Infra board, White Marker Pen, Scissor
Ukuran : 

Tasking Aring 05
Peringkat : PM13C
Kumpulan Tuai : 2

No.Petak = D1
Luas = 63.06 hek
Blok = 18,19 
Stand/Hek =128
Bilangan Task = 72

No.Petak = D2
Luas = 57.36 hek
Blok = 18 
Stand/Hek =128
Bilangan Task = 72

No.Petak = D3
Luas = 60.28 hek
Blok = 13 
Stand/Hek =128
Bilangan Task = 72

Penandaan mini task
App: Avenza

Laporan Tasking






Pembahagian Tugas C1R2
Penuai @ Cutter
1. Potong Buah 
2. Potong Pelepah kering

Carrier 1
1. Susun Pelepah 
2. Potong tandan
3. Tulis no tandan

Carrier 2 
1. Ambil buah ke Lorong atau jalan
2. Kutip biji relai


Laporan Harian Menuai 

Cara 1
Ladang Aring 05
Peringkat PM13C

Tarikh : 03/03/2022
Hek capai : 60.28 / 8.61 
1 sabit : 8.61 / 2.87 hektar
Tan capai : 33.41 / 1.59 tan/mt
Tandan capai : 2399 / 114 tandan
Penuai bekerja : 21/21 org 

Ladang Aring 05
Kumpulan : 2
Peringkat : PM13C (B18/19)

Cara 2
Tarikh : 03/03/2022
Penuai bekerja : 21/21 org
Hek capai : 60.87 hektar
Hek/cutter : 8.70 hektar
Hek/m.day : 2.90 hektar
Tan capai : 33.42 tan
Tan/cutter : 4.77 tan
Tan/m.day : 1.59 tan
Tandan capai : 2399 tandan
Tandan/cutter : 343 tandan
Tandan/m.day : 114 tandan
Catitan :
Petak ke3/pusingan 1

Tiada ulasan:

Catat Ulasan